Hiltra
Storage building 90 minutes fire resistant Nijmegen
A semi-built storage building completely provided by Hiltra, in a 90-minute fire-resistant design. Equipped with fire-resistant hinged and sliding doors. The construction of the liquid-proof floor, including groundwork, was carried out to complete satisfaction.