Storage building for gas cylinders Balk

For the storage and distribution of various types of gas, Hiltra delivered a custom-made Megasaver storage building with a fire resistance of 60 minutes to Paques in Balk. The storage building is divided into four fire compartments for the separate storage of four types of gas. Furthermore, the building has a centrally located technical room for the measuring and distribution stations. From the technical area, the gases are distributed to the various workplaces in the laboratory. The storage building was largely assembled in Barneveld and assembled on site by our own assembly team. The project sum includes: the engineering, the construction file in accordance with the Buildings Decree, the foundation plan/foundation load plan, the project supervision by the Hiltra design engineer up to and including completion, the delivery costs of the materials to the construction site, the unloading of the materials at the construction site, and the complete assembly on site from the finished foundation.

Offers
SWD Ribbed tube heater type RIT 200 (Cetal)
Promotion price
€ 441,70
Drip tray and grid galvanized model HLB 11
Promotion price
€ 624,15
Drip tray and grate galvanised model HLB 1
Promotion price
€ 227,80